November 2016

  • FL-Islandora news:
    • The FL-Islandora project team met on December 8 to discuss priorities for Phase 2 of the IR project. Phase 1 has now been completed.
    • Project details can be found at http://fliirt.wiki.flvc.org.
    • FL-Islandora enhancements have been ranked by ISG and FLVC. See http://islanddev.flvc.org for details.
    • A feasibility study of FL-Islandora workflow integration with the FDA is tentatively expected to begin Q3 FY 2016/2017. This phase will deal with brainstorming of user requirements and possible solutions.
  • Other work:
    • Work is proceeding on the OJS 3.0 Demonstration Site and the new ArchivesSpace installation for St. Pete College.
    • Updates to ExceltoMODS are being tested now and should be in production early next year. I'll be working with UCF to add some common qualified DC elements in the next batch.

September/October 2016

  • FALSC news: the new FALSC Executive Director, Elijah Scott, assumed his new role on October 10.
  • FL-Islandora news:
    • The FL-Islandora IR project is moving along. Phase 1 code enhancements have been installed on project members' Islandora test sites (FAU, FSU, FGCU) for testing.
    • Project details can be found at http://fliirt.wiki.flvc.org.
    • ISG members have submitted their priorities for the next quarter's FL-Islandora enhancements. See http://islanddev.flvc.org for details.
    • FALSC staff have been making site/consultation visits to Colleges by request.
    • FAU has linked their Omeka Fedora Connector plug-in to their FL-Islandora site. Other FL-Islandora users can do the same by requesting setup via help@flvc.org.

July/August 2016

  • FL-Islandora news:
    • An FL-Islandora "IR Camp" was held July 25-26, in the Gainesville office. The wiki related to the project to implement/enhance FL-Islandora institutional repository functionality can be found at: http://fliirt.wiki.flvc.org.
    • A test site for testing IR functionality has been set up: http://ir-test.digital.flvc.org.
    • On Aug. 9 FLVC/FSU IR project team members met with staff from UPEI to discuss their development of IslandScholar.
    • Work continues on a feasibility project to migrate all issues of a newspaper from the Sobek-hosted Florida Digital Newspaper Library to an FL-Islandora FDNL test site.
    • The Islandora Usage Statistics module has been implemented on all FL-Islandora public production sites.
    • Valencia College has requested an FL-Islandora site, and a site visit is being planned.
  • Other news:
    • A new FALSC position - Assistant Director for Digital Platforms - has been posted. (Postings include Code4Lib, the Chronicle of Higher Education, and the ALA jobs list.)
    • The FALSC Executive Director search is still underway.
    • A planning document for Digital Services is being prepared and will be shared with DISC soon for feedback.
    • A test instance of ArchivesSpace is in the process of being set up as part of a project to migrate Archon materials to ArchivesSpace. FAU has volunteered to assist with the project.
    • The upgrade of OJS software to the latest released version, v. 2.4.8, is underway.
    • An Inventory of Digital Libraries and Collections Held by Florida Public Universities and Colleges has been completed and will be posted soon.

March/April 2016

Islandora progress February 11, 2016 - April 13, 2016

Changes made for Islandora that can impact DISC: new Mango format facets.

  • Track 1, new and production sites, misc. issues and changes:
    • UWF's FL-Islandora site (http://uwf.digital.flvc.org) went public on March 4, 2016. The site now includes digital objects migrated from UWF's Lyrasis-hosted Islandora site. The UWF Lyrasis Islandora site represents institutional repository materials.
  • Track 2, data migrations:
    • The UWF Lyrasis to FL-Islandora project has been completed.
  • Track 3, new development:

February 2016

Islandora progress January 14, 2016 - February 10, 2016. The ISG met twice during this period.

  • Track 1, new and production sites, misc. issues and changes:
  • Track 2, data migrations:
    • A sample PDF newspaper has been loaded into fdnl-test.digital.flvc.org. UF has submitted a request for an additional sample.
    • The UWF Lyrasis to FL-Islandora migration is making progress.
    • GCSC: no change
  • Track 3: new development
    • Suggested enhancement of Full Description display to include additional citation information (FSU request, FSU working on prototype)
    • pilot project with FGCU to allow Omeka access to FL-Islandora repository (FGCU objects only) to create exhibits
    • an upgrade of development server to the latest release of Islandora code, 7.x-1.6 is being tested. It will be a few weeks before the code is on the production server. Details of notable changes will be forthcoming, but the new release does contain a significant number of new features. Presentations on changes and new features will be done during ISG meetings and will be announced in advance.
    • Bryan Brown from FSU presented a demonstration and details about the FSU DigiNole project.

Islandora progress

January 2016

To be provided.

December 2015

Repeating November meeting announcement: DISC member Isabel C. Hernandez of Miami Dade College (term 2015-2018) will be retiring at the end of December. (Congratulations and best wishes, Isabel!) The topic of filling the vacancy will be addressed at the December 9-10, 2015, MCLS meeting.

Islandora progress November 18, 2015 - December 7, 2015. The ISG had no meetings during this period, due to holidays and scheduling conflicts.

  • Track 1, new and production sites, misc. issues and changes:
    • FLVC is making good progress in moving existing FL-Islandora documentation to its own MediaWiki.
  • Track 2, data migration:
    • Work on UWF and GCSC migrations is moving forward. Samples have been loaded in both cases.
  • Track 3, new development:
    • The FL-Islandora's production server be upgraded to Fedora 3.7.0, this coming weekend, Dec. 12-13, along with the Solr, Gsearch and Mulgara components. (The older version of Fedora is no longer tested against by the Islandora Foundation/development community.) ISG will be alerted about a moratorium on loading.


November 2015

Announcement: DISC member Isabel C. Hernandez of Miami Dade College (term 2015-2018) will be retiring at the end of December. (Congratulations and best wishes, Isabel!) The topic of filling the vacancy will be addressed at the December 9-10, 2015, MCLS meeting.

Islandora progress October 15, 2015 - November 17, 2015. The DISC ISG had one meeting during this period.

  • Track 2, data migration:
    • The second pass of updating UNF and FAMU PALMM Florida Heritage Collection metadata with DLU01 records has been completed. Not all records required replacement, as in some cases the DigiTool metadata was of better quality than the DLU01 metadata.
    • Work continues on migration of GCSC data into FL-Islandora.
    • Work continues on migration of UWF data into FL-Islandora.
  • Track 3, new development:
    • The FL-Islandora's test server has been upgraded to Fedora 3.7.0, along with the Solr, Gsearch and Mulgara components. (The older version of Fedora is no longer tested against by the Islandora Foundation/development community.)
    • Additional CPUs were added to the FL-Islandora test server and the server has been stress-tested for performance. We're now ready to proceed with a new round of FL-Islandora training.
    • Work is underway to transfer the current FL-Islandora documentation from Google Doc format to Mediawiki format to facilitate searching within documentation. Documentation will be reviewed and updated as necessary during the process.
  • PALMM:
    • A project to identify all historic/current PALMM collections is nearing completion and an "authoritative list" (as authoritative all possible) will be made available on the PALMM page of the public DISC wiki for use in discussions of the DISC PALMM Subcommittee. Individual institutions may be contacted with questions about their collections.

October 2015

Islandora progress September 9, 2015 - October 13, 2015. The DISC ISG had three meetings during this period.

  • Track 1, new and production sites:
    • Lake Sumter State College's FL-Islandora site went public on October 2, 2015 (http://lssc.digital.flvc.org)
    • The FL-Islandora PALMM site went public on September 30, 2015 (http://palmm.digital.flvc.org). DigiTool is no longer accessible by the public, so be aware that any PURLs you created manually to point at DigiTool collections, etc., no longer retrieve the target materials. We're working to provide lists of these PURLs to owning institutions.
    • Metadata feeds from FL-Islandora to Mango are now live for: FL-Islandora PALMM, FAU, FSU, FAMU, UCF.
    • Preparations are being made for the next round of FL-Islandora introductory training via webcast.
  • Track 2, data migration:
    • The first pass of updating UNF and FAMU PALMM Florida Heritage Collection metadata with DLU01 records has been completed. Less than 50 outlier cases still remain.
    • Investigations into possible GCSC and UWF migrations into FL-Islandora are underway.
  • Track 3, new development:
    • The FL-Islandora's development server has been upgraded to Fedora 3.7.0, along with the Solr, Gsearch and Mulgara components. (The older version of Fedora is no longer tested against by the Islandora Foundation/development community.)
    • Except for minor code updates the FL-Islandora technical team is still focusing on performance improvements.

September 2015

Public Access to DigiTool will be discontinued on Sept. 30

Islandora progress August 19, 2015 - September 8, 2015. The DISC ISG had two meetings during this period.

  • Track 1, new and production sites:
    • Two new training sessions targeted at new users have been developed: an Islandora Overview, and a "quick start" hands on training. They'll be presented to FLVC staff on Sept. 14, and after that user training will be scheduled.
    • Mango metadata feeds from DigiTool will be discontinue before Sept. 30 and FL-Islandora metadata feeds will be substituted.
    • Extensive test loading and testing of Islandora Mango feeds is underway for FAMU, UCF, FAU, and FL-Islandora PALMM.
    • Mango test catalog: http://testcat.fcla.edu/alephtest
  • Track 2, data migration:
    • Public access to DigiTool will be discontinued on Sept. 30, but FLVC will have internal access at least through the end of 2015, to deal with any outlier objects.
    • FLVC is still working on replacement of DigiTool metadata for UNF and FAMU FHP records by DLU01 metadata.
  • Track 3, new development:
    • FLVC is soliciting requests for new development:
  • FL-Islandora PALMM:
    • The FL-Islandora PALMM site will go public on Sept. 30 and DigiTool will no longer be accessible by the public. Links in http://palmm.fcla.edu will be switched either to FL-Islandora or to other PALMM hosts. The "Archives Florida" collection references will be commented out.
    • Some of the suggestions made by FLVC's web designer are in the process of being implemented on http://palmm-test.digital.flvc.org. Should the PALMM logo be changed?
    • Question re: PALMM collection links: should the text "PALMM" be added to FL-Islandora PALMM collection labels? This text would appear in Mango Subcollection facets. The alternative would be to omit the "PALMM" text from Mango subcollections.

August 2015

Islandora progress July 8, 2015 - August 18, 2015. The DISC ISG had one meeting during this period.

Lydia Motyka and Gail Lewis attended the first Islandora Conference at UPEI Aug. 3-7, 2015. Highlights:

  • A major new release of Islandora is being worked on, Islandora version 7.x-2.x. It will incorporate Fedora 4 and will allow more native Drupal functionality and functionality of component parts.
  • An IR Interest Group was formed, spearheaded by Bryan Brown from FSU. Boston College has done some interesting work with ETDs using Islandora Scholar.
  • Simon Fraser University has performed migrations from CONTENTdm to Islandora.
  • Track 1, new and production sites:
    • Palm Beach State College requested an Islandora site.
    • A new round of basic FL-Islandora training has been drafted and is planned to begin in September.
  • Track 2, data migration:
    • DigiTool/FL-Islandora cleanup is still underway
  • Track 3, new development:
    • The "Excel to MODS transformer" has moved into production: http://exceltomods.flvc.org/ and all existing users have been transferred to the new production site.
    • Work continues on tracking/improving FL-Islandora performance.
    • FL-Islandora development priorities will be updated.

July 2015

Islandora progress June 11, 2015 - July 7, 2015. The DISC ISG had one meeting during this period.

  • Track 1: new and production sites:
    • FAMU's Islandora site is now "live" and open to the public.
    • FLVC continued to work with Islandora production sites to improve collection inventories and usage statistics. The use of Google Analytics and customized reports has been documented.
    • FLVC is beginning to focus efforts on performance and throughput on the FL-Islandora production server and will continue work to "stabilize" the server.
  • Track 2: data migration:
    • The initial DigiTool to Islandora migration is complete for all sites, all materials.
    • Next steps, summer 2015:
      • FLVC and owning institutions complete review and troubleshooting of migrated materials and correct/reload individual objects as necessary.
      • A complete inventory of DigiTool materials, collection-by-collection, is underway and will be compared to materials migrated to Islandora.
      • Replacement of approx. 400 objects' DigiTool metadata with DLU01 metadata (UNF and FAMU Florida Heritage materials).
      • Continued work on Islandora to Mango feeds for FL-Islandora production sites, and discontinuing DigiTool/DLU01 Mango feeds.
      • FLVC will perform intitial "sharing" of FL-Islandora objects from institutional sites with FL-Islandora PALMM site for current PALMM collections. Eventually PALMM materials in FL-Islandora will be shared with Mango from the FL-Islandora PALMM site and PURLS will point from Mango to the FL-Islandora PALMM site.


  • Track 3: new development:
    • After completion of an initial pass at improving FL-Islandora inventories and statistics, developer efforts will focus on Islandora production performance.
  • PALMM:
    • The FL-Islandora site is under construction and is being themed, and PALMM collection objects from institutional sites are being shared with the site. (The FL-Islandora PALMM site, http://palmm.digital.flvc.org is not yet public but is open to ISG IP ranges).
    • Initially only legacy PALMM materials will appear on the FL-Islandora PALMM site. FSU institutional collections will be removed pending the larger discussion of what constitutes a PALMM collection.
    • A public DISC wiki has been created, https://discpublic.wiki.flvc.org/, and FLVC has begun moving/consolidating PALMM information there. (Other materials from the non-public wiki will be gradually moved over to the public wiki.)
      • FLVC will perform an inventory of current PALMM collections based on the database of collection codes, and will post the current PALMM collections list to the public DISC wiki.
    • FLVC will begin to investigate the feasibility of using Mango (and any future replacement discovery tool) as the PALMM federated engine, and the feasibility of PALMM/Mango addressing the role of FLVC's legislatively mandated database of digital collections and archives. We will consider how we might interact with the Digital Public Library of America (DPLA).
    • FLVC will investigate replacing the legacy palmm.fcla.edu web page(s) with either an Islandora or Mango landing page.

June 2015

Islandora progress May 14, 2015 - June 10, 2015. The DISC ISG had two meetings during this period.

  • Track 1: new and production sites:
    • UCF's site is now "live" and available for the public ( http://ucf.digital.flvc.org)
    • FAMU's site is in preparation for going "live".
    • A new test site has been created for St. Petersburg College, for a total of 9 colleges and 10 university Islandora sites (4 "non-public")
    • FLVC is working with Islandora production sites to improve collection inventories and usage statistics for FY 2014/2015 reporting.
  • Track 2: data migration:
    • UF's DigiTool migration is more than half completed.
    • 5 newspapers have been migrated from DigiTool to Islandora.

May 2015

Islandora progress April 15, 2015 - May 13, 2015. The DISC ISG had one meeting during this period.

  • Track 1: new and production sites:
    • FLVC will begin populating the production PALMM site soon, by "sharing" objects from institution sites with collections on the PALMM site. A list of collections and order of "sharing" will be created and discussed with owning institutions.
  • Track 2: data migration:
    • UWF's DigiTool migration is essentially complete.
    • UF's DigiTool migration is actively underway.
    • DigiTool migration for other institutions is essentially complete, with the exception of serials, newspapers, and a handful of other materials.
  • Track 3: new development:
    • A "Reports" tab is available in production that will produce collection counts. Please test the functionality and provide feedback to FLVC, as you will need to be running end of fiscal year statistics soon.
  • PALMM
    • As we begin to work in earnest on the FL-Islandora PALMM site, FLVC recommends that existing PALMM documentation be revisited and updated and actively shared with FLVC stakeholders to increase participation in PALMM and renew its visibility.

April 2015

Islandora progress March 11, 2015 - April 14, 2015. The DISC ISG had three meetings during this period.

  • Track 1: new and production sites:
    • Work on enhancing and monitoring FL-Islandora production server resources continues.
  • Track 2: data migration:
    • DigiTool migrations continue.
    • Migration has begun of UF DigiTool collections with Sobek MARCXML metadata replacing DigiTool metadata. "Exact matches" are loading first, then "Fuzzy matches".
  • Track 3: new development:
    • Test runs of UCF's Islandora Mango feed are underway.
    • "collection pages" enhancements are now available on the production server. (short demo)
    • unattended batch load Phase 1 code should begin testing this week. USF DigiTool newspaper ready for test-loading with the new code.
    • FSU continues work on Islandora Scholar. (short demo; a more extensive presentation will be scheduled.)
      • Islandora Scholar is installed on the FSU production site and thesis Content Model objects are being actively loaded by FSU.

March 2015

Islandora progress February 11, 2015 - March 10, 2015. The DISC ISG had two meetings during this period.

  • Track 1: new and production sites:
    • A non-public production site was create for USF for collaborative PALMM collections.
    • extensive work on enhancing FL-Islandora production server resources
  • Track 2: data migration:
    • FAU's FAU01 materials are nearing completion
    • The current focus is on migrating PALMM collections for UNF, UWF, USF, UF
    • Work is underway to attempt to replace UF's DigiTool PALMM metadata with Sobek MARCXML records
  • Track 3: new development:
    • The first production load of an Islandora to Mango feed was completed for FGCU.
    • "collection pages" enhancements are being tested by ISG on the Islandora test server
    • work on Advanced Search modifications
    • work on in-site Google Analytics (Google Analytics available from within individual Islandora sites instead of via the Google site).
    • discussions of unattended batch load for newspaper issues.

February 2015

under construction

Islandora progress January 21, 2015 - February 10, 2015. The DISC ISG had two meetings during this period.

  • Track 1: new and production sites:
    • A non-public production site was created for UNF for collaborative PALMM collections.
    • A public production site was created for Lake Sumter State College.
    • A non-public production site was create for UWF for collaborative PALMM collections.

January 2015

Islandora progress December 10, 2014 - January 20, 2015. The DISC ISG had one meeting during this period.

  • Track 1: new and production sites:
    • a non-public test site was created for UNF for collaborative PALMM collections.
    • State College of Florida production site created.
  • Track 2: data migration:
    • DigiTool to Islandora migration is focusing on serials migration and migration of PALMM collections.
    • FAU non-PALMM compound objects and serial loads are underway.
    • Work is underway on migration of UF DigiTool PALMM collections, substituting Sobek MARCXML for DigiTool descriptive metadata.
  • Track 3: new development:
    • New Islandora 7.14 release is installed on test server, and install on production server is expected Jan 24/25. This will include installation of Scholar on FSU site for beta development.
    • ISG has approved work to extend information pages for collections.
    • Misc. display changes/improvements.
    • Work has begun on collection reports.

December 2014

Islandora progress November 13, 2014 - December 9, 2014. The DISC ISG had one meeting during this period.

  • Track 1: new and production sites:
    • a non-public production site was created for FIU for collaborative PALMM collections
    • proceeding with creation of a non-public site for UNF
    • a production site was created for State College of Florida and they're ready to start loading their data.
    • a test site was created for Indian River State College
  • Track 2: data migration:
    • DigiTool to Islandora migration is focusing on serials migration and migration of PALMM collections.
    • tentative target date for discontinuing DigiTool: April 1, 2015.
  • Track 3: new development:
    • Drexel University's EAD module was investigated
    • University of Toronto's Oral Histories module was installed on the FLVC development server and tested.
    • misc. display changes and improvements
    • FLVC has installed new Islandora release 7.14 and is testing on development server
    • work continues on Islandora PALMM site theming/presentation.

November 2014

under construction

Islandora progress October 8, 2014 - November 12, 2014.

  • Track 1: new and production sites:
  • Track 2: data migration:
  • Track 3: new development:

October 2014

under construction

Islandora progress September 19, 2014 - October 7, 2014. The DISC ISG had one meeting during this period.

  • Track 1: new and production sites:
  • Track 2: data migration:
  • Track 3: new development:
    • Offline batch ingest is installed in production


September 2014

Islandora progress August 13, 2014 - September 9, 2014. The DISC ISG had two meetings during this period.

  • Track 1: new and production sites:
    • FGCU's FL-Islandora site went public on September 2: http://fgcu.digital.flvc.org
    • A production site has been created for Hillsborough Community College. They will begin loading their Ruskin Historical Collection.
  • Track 2: data migration:
    • UCF's DigiTool migration has resumed. Florida Historical Quarterly is being migrated.

August 2014

Islandora progress July 19, 2014 - August 12, 2014. The DISC ISG had two meetings during this period.

  • Track 1: new and production sites:
    • An FL-Islandora test site has been created for Hillsborough Community College.
    • Misc. small changes and enhancements were made to the production server.
  • Track 2: data migration:
    • FAMU's data migration from DigiTool to Islandora has been completed, with the exception of PDF-based serials.
    • FGCU's data migration from DigiTool to Islandora is substantially complete, although FGCU may elect to do descriptive metadata cleanup that would require some reloading of objects into Islandora.
    • FGCU: transformation of metadata in Excel to MODS is underway to facilitate their loading of new materials.
    • FGCU: testing of migration of Sobek books into Islandora has begun.
  • Track 3: new development:
    • Refinement of serials module functionality and display is still underway, but the module is substantially complete and testing of migration of FAU's DigiTool PDF-based serials has begin on the Islandora test server.
    • Offline ingest functionality has been beta-tested and user beta-testing will begin shortly.
    • Evaluation of the Islandora Scholar module is underway.

July 2014

Islandora progress June 19, 2014 - July 9, 2014.

to be provided

June 2014

Islandora progress May 14, 2014 - June 18, 2014. The DISC ISG had three meetings during this period and is now meeting on a biweekly basis.

  • Track 1: new and production sites:
    • FAU's FL-Islandora site has gone public
    • Two new test sites were created at UF's request: a University of Florida site and a Florida Digital Newspaper Library site.
    • The following new functionality was added to production:
      • A FlexSlider slideshow function.
      • The Compound Object Content Model was upgraded to correct some problems in the older version.
      • Misc. other display and metadata changes were made.
  • Track 2 - Data Migration:
    • Data migration from DigiTool continues for FAU and UCF
    • Data migration from DigiTool is underway for FAMU
    • Work on unattended batch ingest functionality was resumed.
  • Track 3 - New Development:
    • A beta version of the Serials module is being tested on the FL-Islandora development server.
    • Display enhancements to the Newspapers module were made and are being tested.

May 2014

Legislature affecting FLVC: "HB 5101, relevant language beginning on page 14) now contains language regarding FLVC. Like the bills we have been monitoring throughout the session, this bill repeals the statute establishing FLVC and creates two new organizations housed within the University of West Florida.

Complete Florida Plus Program

  • Will provide distance learning/student support services similar to those currently provided by FLVC, as well as the Complete Florida Degree Initiative (previously called the Complete Florida Degree Program, already in existence at UWF) and a K-20 student advising system.

Florida Academic Library Services Cooperative

  • Will provide library support services similar to those currently provided by FLVC.
  • Must make all e-resources licensed for 4-year degree seeking students available to all 4-year degree seeking students. We are currently working to determine the impact of this language on the statewide collection.
  • Will be overseen by a director who reports to the director of UWF’s Complete Florida Plus Program.

All FLVC personnel and assets will transfer to UWF by the legislatively mandated deadline of December 31, 2014."

Islandora progress April 9, 2014 - May 13, 2014. The DISC ISG had three meetings during this period.

Work this month, organized by the three "Tracks" now being used to report work in ISG meetings, included:

  • Track 1: new and production sites:
    • FAU's FL-Islandora site is prepared to go public.
    • Misc. smaller production changes:
      • MARCXML tab can now be displayed/suppressed by site and role. (Most users want to suppress this from public view.)
      • Title as subject enabled as a new search facet
      • Various metadata mapping changes.
  • Track 2: data migration/data loads:
    • FSU DigiTool data migration is complete.
    • The majority of FAU's DigiTool materials have been migrated.
    • UCF's migration from DigiTool continues.
  • Track 3: development:
    • Binary Object ("Download only" object) Content Model is now in production.
    • Video Content Model is now in production.
    • Enhancements to Google Analytics have been moved to production.
    • Serials development is underway.


April 2014

Legislature affecting FLVC:

Islandora progress March 12, 2014 - April 8, 2014. The DISC ISG had two meetings during this period.

Work this month, organized by the three "Tracks" now being used to report work in ISG meetings, included:

  • Track 1: new and production sites:
    • A metadata subgroup of ISG has been created for discussion of descriptive metadata issues: forms changes, mapping and transformations. Work of this subgroup is being done via the FL-Islandora listserv. A reminder that digital collections catalogers should be on that list. There are several metadata issues that have been sent out via the list for comment by the end of the week.
    • Various metadata display changes were put into production on 3/16/14.
  • Track 2: data migration/data loads:
    • FSU migration of DigiTool PALMM materials into Islandora is nearing completion. The last batch of PALMM materials is being loaded and completion of this load will complete the migration of FSU DigiTool materials into Islandora.
    • FAU migration of DigiTool materials is still progressing.
    • UCF migration of DigiTool materials is still progressing.
  • Track 3: development:
    • The Binary Object Content Model is on the test server and available for configuration by the "Islandora Site Administrator" role.
    • Enhancements of Islandora statistics are being prototyped in Google Analytics and Logaholic.

March 2014

Progress February 12, 2014 - March 11, 2014. The DISC ISG had three meetings during this period.

Work this month, organized by the three "Tracks" now being used to report work in ISG meetings, included:

  • Track 1: new and production sites:
    • FAMU initial site setup is complete
    • A number of software/configuration adjustments were made to the production server based on production user feedback.
    • FAU presented their Islandora site in a demo to stakeholders to very positive reviews.
    • Islandora production users are contributing their own local workflow documentation to the FL-Islandora wiki.
  • Track 2: data migration/data loads:
    • FSU migration of DigiTool PALMM materials into Islandora has begun.
    • FAU migration of DigiTool materials is still progressing.
    • UCF migration of DigiTool PALMM materials into Islandora is resuming.
  • Track 3: development:
    • Work on refining Serials module requirements is nearing completion.
    • Substantial work has been done on the Video Content Model. The content model is now available for testing on the Test Server.
    • Compound Object Content Model displays have been customized and are in production.
    • Work has begun on the topic of Islandora inventory and usage statistics, with the Islandora Reports module installed on the development server for testing and possible development.


General Digital Services announcements:

  • The FDA's second production server is in the process of being moved to NWRDC Atlanta, and after the move is finished normal FDA operations will resume.
  • OJS:
    • OJS software upgrade to the latest version is underway. Local customizations on the current version will need to be reviewed and ported over as necessary.
    • OJS has a feature that allows export of journal issues as SIPs ready for archiving. Instructions will be sent once the FDA GUI submit is re-enabled.


February 2014

Progress January 8, 2014 - February 11, 2014. The DISC ISG had three meetings during this period.

Note: On February 12, 2014, the FCLA/FLVC legacy RT ticket issue-tracking system was discontinued and the CRM system has gone into production. The text of the announcement:

    Just a reminder, the changes below will take place tomorrow.
    
    Over the past year, FLVC has been working to consolidate the various customer support functions of its four legacy organizations (FCLA, CCLA, DLC, and FCAAS/FACTS) 
    to better serve you when you need assistance using our services. 
    
    We’re pleased to announce that on February 12, we will begin providing customer support to all of our users – students, college and university library staff, 
    institutional distance learning and student services staff, faculty, and others – in this new, consolidated Help Desk environment. 
    
    The Help Desk is staffed from 8:00 a.m. to 5:00 p.m. ET, Monday through Friday. If you need assistance during those times, simply email us at help@flvc.org, 
    or call us toll-free at 1-877-506-2210. Email support is available after hours until 8:00 p.m. ET.
    
   **IMPORTANT** Also beginning February 12, the legacy RT service used by university libraries will no longer be available. All open requests from the RT system 
   will be migrated to new customer support software that we plan to make available to libraries in late February. We will send out details about that software in 
   the coming weeks. Until then, if you need to check on the status of a service request, please contact the Help Desk.

Work this month, organized by the three "Tracks" now being used to report work in ISG meetings, included:

  • Track 1: new and production sites:
    • Support for FSU's Islandora site going public
    • Setup of a new FAMU Islandora site is underway
  • Track 2: data migration/data loads:
    • DigiTool migration for FSU is substantially complete
    • DigiTool migration for FAU continues
    • preparation for DigiTool migration for FAMU has begun
    • A new DC-to_MODS metadata form has been added to the Islandora test server for ease of metadata entry for individuals who prefer Dublin Core element labels.
  • Track 3: development:
    • Binary Object development is substantially complete on the Islandora development server
    • metadata forms enhancements are underway
    • enhancements have been made to the Newspapers Content Model and that module is now in production
    • initial testing of the Video Content Model is substantially complete
    • initial testing of the Islandora to Mango functionality is substantially complete
    • initial testing of the OAI-harvesting functionality is substaintially complete
    • work has begun on requirements for an Islandora Serials module.

January 2014

Progress December 11, 2013 - January 7, 2014. Due to the holidays, the DISC ISG had only one meeting during this period.

Note: During the second half of December FLVC completed a legislatively mandated Data Center Consolidation. All Islandora servers are now located at NWRDC in Tallahassee.

Work this month, organized by the three "Tracks" now being used to report work in ISG meetings, included:

  • Track 1: new and production sites:
    • An Islandora production site has been set up for Broward College
    • A number of changes and enhancements were made to the MODS descriptive metadata forms
  • Track 2: data migration:
    • DigiTool migrations for FSU, FAU, UCF continue
  • Track 3: development:
    • Conditional display of IP embargo message developed and discussion of text and formatting of overlay text for embargoed objects continued.
    • Merge/sharing at the object level (in addition to collection-level merge/sharing) added to production
    • Subject and Name metadata, when clicked, executes a search on that heading

December 2013

Progress November 13 - December 10, 2013. The DISC ISG had four meetings during this period.

Work this month, organized by the three "Tracks" now being used to report work in ISG meetings, included:

  • Track 1: new and production sites:
    • An Islandora production site has been set up for Northwest Florida State College
    • Training sessions were held for the second Islandora cohort
    • A "Site Administrator" role was created to enable local site modifications.
  • Track 2: data migration:
    • DigiTool migrations for FSU, FAU, UCF continue
  • Track 3: development:
    • Compound Object Content Model installed in production
    • IP embargo feature installed in production and discussion regarding overlay text for embargoed objects was started.
    • Restricted viewing of collections/objects by user role ("XACML Editor") installed in production
    • Zip file importer/ingesting of zip files of unitary objects installed in production


November 2013

Progress October 9, 2013 - November 12, 2013. The DISC ISG had five meetings during this period.

Work this month, organized by the three "Tracks" now being used to report work in ISG meetings, included:

  • New site setup:
    • An Islandora Gulf Coast State College site has been created and one is underway for Northwest Florida State College. These institutions will be included in the second cohort of Islandora site.
    • Three training sessions were conducted for the first Islandora cohort: FAU, UCF, and FGCU.
    • An FLVC-FL-ISLANDORA@LISTSERV.FLVC.ORG listserv for Islandora users has been created for institutions with Islandora sites - To subscribe, send an email to listserv@listserv.flvc.org with the following message in the body:
    SUBSCRIBE FLVC-FL-ISLANDORA
  • Data conversion and migration:
    • Migration of FSU's second batch of DigiTool records to Islandora has been finished and the third batch of DigiTool materials has been converted and loading has started.
    • Discussions regarding migration from ContentDM have been started.
  • Development:
    • New developments have been made available on the Islandora test server: islandora7t.fcla.edu
      • Newspapers functionality
      • Audio module
      • Embargo functionality
    • Work has begun on specifications for the Islandora to Mango process.

October 2013

Progress September 11 - October 8, 2013. The DISC ISG had three meetings during this period.

Work this month, organized by the three "Tracks" now being used to report work in ISG meetings, included:

  • New site setup:
    • FAU and UCF production sites were created. These sites are not yet public.
    • Setup of an FGCU production site is underway.
    • Setup of PALMM test site and discussions about the eventual production PALMM site resulted in a working prototype of the Islandora production PALMM site.
  • Data conversion and migration:
    • Migration of FSU's second batch of DigiTool materials is underway.
    • Test migration of FAU's DigiTool materials, including embargoed ETDs, is underway. FAU's production site is ready for the production migration.
    • Analysis of FGCU's DigiTool materials for conversion has begun.
  • Development:
    • DGI delivered code enhancements for Compound Objects which are pending installation on the development server.
    • The Audio module has been tested.
    • Testing of a variety of new features is underway. A new spreadsheet is under construction to enable tracking of testing and development of new features.